Vc Corridor
Caplina, BiH
Express way section AI with 3 bridges
Challenge & Solution
High wind loads at upper floors required reinforced formwork bracing system. Our engineering team designed custom wind-resistant connections.
Results
Completed 3 months ahead of schedule. Zero safety incidents. Concrete finish quality exceeded client expectations.
Project Details
Client:
Al Rashid Development
Completion Date:
6/15/2024
Products Used:
Steel Frame Formwork Panel,Aluminum Scaffolding Tower,Adjustable Steel Prop