Vrbas Bridge Section (Belgrade-Budapest Railway).

Vrbas Bridge Section (Belgrade-Budapest Railway).

Vrbas, Serbia

Major river crossing bridge with 450m main span. Our formwork systems were used for pier cap and deck segment construction.

Challenge & Solution

Complex tidal conditions required precise scheduling of concrete pours. Modular formwork allowed rapid reconfiguration between segments.

Results

Bridge opened to traffic on schedule. Formwork reuse achieved 40% cost savings vs traditional methods.

Project Details

Client:

China Highway Engineering Group

Completion Date:

4/3/2025

Products Used:

Concrete Formwork Beam,Heavy Duty Shoring Jack,Safety Guardrail System

Request Similar Solution

Project Gallery

Site photos from this project

Vrbas Bridge Section (Belgrade-Budapest Railway). site photo 1
Vrbas Bridge Section (Belgrade-Budapest Railway). site photo 2